In 2021, we started to secure agreements with our local technical advisors to identify preliminary land rights to design a facility with a capacity exceeding 80 MW in Southern Italy. Grid connection has been approved Q4 2021 and the detailed design of the facility is ongoing, proceeding to the next stages of the permitting process.
A large pool of preliminary land rights has been secured to design several facilities with a total capacity exceeding 120MW. The design of the facilities is ongoing. Some of the facilities are to be designed with an innovative concept of solar agri-farms producing almonds and olives while generating electricity thanks to solar irradiation.
RYMONOX is currently developing a pool of facilities with a total capacity exceeding 50MW reaching Ready To Build (RTB) stage in 2025 in Southern Europe. Preliminary grid connection approvals have been secured and the company is entering the final stage to secure the permits to reach RTB stage. Detailed design has been completed and the Procurement and Commissioning plan is being completed in Q4 2024.
We look for agricultural lands, industrial lands and any project under development prior to Ready to Build (RTB) stage.